2 bedroom Terraced House Sold STC

Pine Road, Glenfield, LE3

Offers over £199,950 | SSTC

2 Bedrooms
2 Bathrooms
2 Receptions

Leicester Forest East

18 Hinckley Road, 
Leicester Forest East, 
LE3 3GH, 
Standout Features

Property Description

Enjoying car standing to the front, this traditional two bedroomed mid terrace would be an ideal first home or buy to let investment and must be viewed in person to truly appreciate the accommodation on offer. The gas centrally heated layout features an entrance porch, two reception rooms, kitchen and downstairs shower room, with the first floor boasting two double bedrooms and a bathroom. The plot enjoys a particularly private garden at the rear not overlooked from beyond Situated within close proximity to bus routes, local schooling and motorway links, an early viewing is strongly recommended to avoid disappointment. EPC rating: D. Council tax band: B, Tenure: Freehold,

Additional Information
EPC Rating:
D
Tenure:
Freehold
Rooms
Accommodation

Front entrance door opens into the:

Entrance Porch

With tiled flooring and a door leading to the:

Lounge
3.82m x 3.43m max

Positioned around a feature exposed brick chimney breast, the front reception room offers a window to the front elevation. With a built in meter cupboard, central heating radiator, characterful wood flooring, coving and a door leading to the:

Inner Lobby

With a useful cupboard and open access leading through to the:

Dining Room
3.81m x 3.42m max

Perfect for formal dining, the second reception room offers a window to the rear elevation. With a concealed staircase rising to the first floor, central heating radiator, wood effect flooring and coving. Open access leads through to the:

Kitchen
2.72m x 1.86m

Fitted with a range of wall mounted and base units with complementary roll edge work surfaces over and tiled splashbacks. Features include an inset 1.5 sink and drainer with mixer tap, space for cooker, wall mounted central heating boiler and space for under counter appliances. With a window to the side elevation, side access door and a door leading to the:

Shower Room
1.93m x 1.97m

Fitted with a three piece suite comprising a shower cubicle, wash hand basin and wc, with tiled flooring, central heating radiator and a window to the side elevation.

First Floor Landing

Giving access to the bedrooms.

Bedroom One
3.82m x 3.43m max

A double room offering a window to the front elevation, with carpet flooring, characterful cast iron fireplace, coving and a central heating radiator.

Bedroom Two
3.86m x 3.43m

Another double room offering a window to the rear elevation, with a built in cupboard with a hatch to the loft space, coving, central heating radiator and carpet flooring. A door leads to the:

Bathroom
2.56m x 1.81m

Fitted with a three piece suite comprising a bath with brick effect tiled splashbacks, wash hand basin with storage beneath and wc, with a central heating radiator and a window to the rear elevation.

Outside

The plot offers car standing to the front. There is shared access across the rear of the property with a small courtyard garden adjacent to the kitchen which leads to a mainly laid to lawn garden with fencing to boundaries and not overlooked from beyond.

Tenure & Council Tax

We understand the property to be freehold with vacant possession upon completion. Blaby - Tax Band B. Please be advised that when a property is sold, local authorities reserve the right to re-calculate the council tax band.

Viewing Arrangements

Viewings are strictly by appointment only.

Need Independent Mortgage Advice?

We are pleased to introduce Benjamin York, who works with Newton Fallowell Estate Agents to provide our customers with expert mortgage advice. He has access to thousands of mortgages, including exclusive deals not available on the high street. His advice is tailored to your circumstances, whether you’re looking to take your first steps on the property ladder, moving home, or even investing in a buy-to-let property. He can help find the right mortgage for you and support your application every step of the way. To speak with our expert 'in branch' adviser, please contact our office.

Making an Offer

In line with current money laundering regulations, prospective buyers will be asked to provide us with photo I.D. (e.g. Passport, driving licence, bus pass etc) and proof of address (e.g. Current utility bill, bank statement etc). You will also be asked to provide us with proof of how you will be funding your purchase. Please note that when making an offer, if you are taking out a mortgage, you will also be asked to have a no obligation chat with our 'in branch' mortgage adviser to confirm your affordability. We ask for your cooperation in this matter. We ask for your cooperation in this matter as this information will be required before a sale can be agreed.

Agents Note

These particulars, whilst believed to be accurate are set out as a general outline only for guidance and do not constitute any part of an offer or contract. Details are given without any responsibility, and any intending purchasers, lessees or third parties should not rely on them as statements of representation of fact, but must satisfy themselves by inspection or otherwise as to their accuracy. All photographs, measurements (width x length), floorplans and distances referred to are given as a guide only and should not be relied upon for the purchase of carpets or any other fixtures or fittings. All services and appliances have not and will not be tested by Newton Fallowell. Lease details, service ground rent are given as a guide only and should be checked and confirmed by your solicitor prior to exchange of contracts. No person in this firms employment has the authority to make or give any representation or warranty in respect of the property. We retain the copyright.

Referrals

Newton Fallowell and our partners provide a range of services to our vendors and purchasers, although you are free to choose an alternative provider. We can refer you to Benjamin York at Chamelo to help with finances, we may receive a referral fee if you take out a mortgage through him. If you require a solicitor to handle your sale or purchase, we can refer you on to a panel of preferred providers and we will receive a referral fee should you decide to use them to sell or purchase a property. We can also refer you to a surveyor and energy assessor and we will receive a referral fee should you use their services. If you require more information regarding our referral programmes, please ask at our office.

Free Property Valuations

If you have a house to sell then we would love to provide you with a free no obligation valuation.


Mortgage calculator

Calculate Your Stamp Duty
£
Results
Stamp Duty To Pay:
Effective Rate:
Tax Band % Taxable Sum Tax

Pine Road, Glenfield, LE3

Struggling to find a property? Get in touch and we'll help you find your ideal property.

Interested in viewing this property?
Book a Viewing
Main menu